{"id":629,"date":"2012-10-20T17:10:42","date_gmt":"2012-10-21T00:10:42","guid":{"rendered":"http:\/\/ayresrocks.com\/blog\/?p=629"},"modified":"2012-10-20T17:10:42","modified_gmt":"2012-10-21T00:10:42","slug":"return-to-building","status":"publish","type":"post","link":"https:\/\/ayresrocks.com\/blog\/?p=629","title":{"rendered":"Return to building"},"content":{"rendered":"<p>I have spent most of October back on the block, working towards finishing the walls by the end of this month. The good news is it looks like we&#8217;ll finally make a deadline with 4 honest days&#8217; work left to complete the ninth level of the external blocks.<\/p>\n<p>Here are a few pic updates of what&#8217;s happening around the place.<br \/>\n<a href=\"http:\/\/www.ayresrocks.com\/2012-10-10\/01.JPG\" target=\"blank\" rel=\"noopener\"><img src=\"http:\/\/www.ayresrocks.com\/2012-10-10\/t01.JPG\" border=\"0\" alt=\"\" \/><\/a> <a href=\"http:\/\/www.ayresrocks.com\/2012-10-10\/02.JPG\" target=\"blank\" rel=\"noopener\"><img src=\"http:\/\/www.ayresrocks.com\/2012-10-10\/t02.JPG\" border=\"0\" alt=\"\" \/><\/a> <a href=\"http:\/\/www.ayresrocks.com\/2012-10-10\/03.JPG\" target=\"blank\" rel=\"noopener\"><img src=\"http:\/\/www.ayresrocks.com\/2012-10-10\/t03.JPG\" border=\"0\" alt=\"\" \/><\/a><\/p>\n<p>Pic 1 above is &#8220;Tweety&#8221; the mixer. It is a beast of a machine and has been working even harder than the mixer we killed before. Pic 2 shows the only real damage almost 5 months of cold miserable weather has caused to the existing walls with the blocks becoming &#8220;face blown&#8221;. Not a great deal to us since we&#8217;re more interested in a house with character than one which is\u00a0clinical perfection. Pic 3 is where the first of the aquaponics sheds will go, once the roof is on the house.<\/p>\n<p>Pic 4 below shows the woodlot planted around 3 years ago. Many of these gums are now over 2 metres tall and should be ready to start harvesting in another 2-3 years.<br \/>\n<a href=\"http:\/\/www.ayresrocks.com\/2012-10-10\/04.JPG\" target=\"blank\" rel=\"noopener\"><img src=\"http:\/\/www.ayresrocks.com\/2012-10-10\/t04.JPG\" border=\"0\" alt=\"\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>I have spent most of October back on the block, working towards finishing the walls by the end of this month. The good news is it looks like we&#8217;ll finally make a deadline with 4 honest days&#8217; work left to complete the ninth level of the external blocks. Here are a few pic updates of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[2],"tags":[],"_links":{"self":[{"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=\/wp\/v2\/posts\/629"}],"collection":[{"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=629"}],"version-history":[{"count":0,"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=\/wp\/v2\/posts\/629\/revisions"}],"wp:attachment":[{"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=629"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=629"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ayresrocks.com\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=629"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}