Update on costs
RCI Engineering for site inspections before the slab pour – $430.98
United Fasteners for the threaded tie down rods – $684.90
Termimesh for slab penetration meshing – $522.50
Senturion Steel for materials to make an earth sift – $87.50
Total project spend is now at $275 014.43
House only is now $61 061.43
Cost per square metre is now $212.02