Pad Complete
This morning I was on the block to clear the pasture from where the plumber needs to sink the septic and soakage trenches. The pad was complete and the engineers site report was attached to one of the pegs. The engineer has specified we require no extra mesh or concrete, classifying the site as complying with the requirements of a full cut. After the hassles with all that rock this is the best outcome possible for us.
Tomorrow morning I am meeting with the plumber on site to discuss layout, septic, soakage and drain placements. He expects to be done within a couple of days which means we should with some luck have the slab curing away sometime early into next week.
More photos of the progress can be found on the flickr account.