75% done
Things are slowing dramatically at the moment.
Just about every day has some sort of rainfall event, ranging from the annoying to the work stopping. The temperatures are already approaching zero overnight and we are back to allowing 2 days between pour and strip down of the moulds to allow the earth to harden enough to avoid damage. The cold is also bringing large amounts of heavy fog and dew which coats everything and having to “dry” everything again slows the processes from cleaning to oiling and resetting.
It’s all rather frustrating, but that is the joy of building with mud.